Centreville Tanks
Burnaby, BC
Concord Pacific
2019
Environment, Meeting CSR Standards AW
• 12 Settling Tanks + Equalization Tank
• Flocculant Injection
• pH Control
• Sand Filtration
SUMMARY
Multi-Tower Residential and Commercial Project utilizing an equalizer tank, 12 poly settling tanks, pH control, and Sand Filtration before discharging into the environment meeting CSR AW Standards.
PROJECT
LOCATION
CLIENT
COMMENCEMENT
DISCHARGE POINT
HIGHLIGHTS
Shoreline
Metro Vancouver, BC
Undisclosed
2019
N/A
• Environmental
• pH Balance
• Bubble Tubing
SUMMARY
Bubble tubing was installed around the construction of a lift station in a fish bearing stream to ensure pH remained within an acceptable range to ensure minimum disruption to the environment.
PROJECT
LOCATION
CLIENT
COMMENCEMENT
DISCHARGE POINT
HIGHLIGHTS
Sediment Removal Frac Tank
Greater Vancouver Regional District, BC
Undisclosed
2019
City Storm System
• Sediment Control
• Frac Tank
• Floucculants
SUMMARY
Sediment control for a commercial development. System uses flocculant and a frac tank to remove sediment before discharge into the storm system.
PROJECT
LOCATION
CLIENT
COMMENCEMENT
DISCHARGE POINT
HIGHLIGHTS
Wheel Washes
Surrey, BC
Undisclosed
2019
N/A
• 2 Tire Revolutions
• 120 GPM
• 45 Tonne Max Load
• Model – TW24
SUMMARY
Installation of a MODEL-TW24 automatic tire washer for a commercial development in Surrey. This Wheel wash boasts 2 tire revolutions, 120 gpm, & a max load of 45 tonne.
PROJECT
LOCATION
CLIENT
COMMENCEMENT
DISCHARGE POINT
HIGHLIGHTS
Metrocan
Burnaby, BC
Undisclosed
2019
Burnaby City Storm System
• Flocculant Injections
• pH Control
• 3 Setting Tanks
• Sand Filter
SUMMARY
Sediment control for a commercial development in Burnaby. System utilizes flocculant injection, pH control, 3 settling tanks and sand filter before discharge into the storm system.
PROJECT
LOCATION
CLIENT
COMMENCEMENT
DISCHARGE POINT
HIGHLIGHTS
YRV Remediation
YVR – Richmond, BC
Jacob Brothers
2018
Environment, CSR Standards DW & AW
• Iron Contamination
• Sediment Removal
• pH Control
• Sand Filter
• Bag Filtration
SUMMARY
Remediation for iron contamination using oxidizer injection system, sand and bag filtration for YVR. The system utilized flocculant injection, pH control, 4 frac settling tanks, sand and bag filtration before discharge into the environment meeting CSR standards DW & AW.