HIGHLIGHTS OF SELECT PAST PROJECTS CONDUCTED BY
LIONSGATE WATER TREATMENT LTD.

PROJECT

LOCATION

CLIENT

COMMENCEMENT

DISCHARGE POINT

HIGHLIGHTS

Centreville Tanks

Burnaby, BC

Concord Pacific

2019

Environment, Meeting CSR Standards AW 

• 12 Settling Tanks + Equalization Tank
• Flocculant Injection
• pH Control
• Sand Filtration

SUMMARY

Multi-Tower Residential and Commercial Project utilizing an equalizer tank, 12 poly settling tanks, pH control, and Sand Filtration before discharging into the environment meeting CSR AW Standards.

PROJECT

LOCATION

CLIENT

COMMENCEMENT

DISCHARGE POINT

HIGHLIGHTS

Shoreline

Metro Vancouver, BC

Undisclosed

2019

N/A


• Environmental 
• pH Balance
• Bubble Tubing

SUMMARY

Bubble tubing was installed around the construction of a lift station in a fish bearing stream to ensure pH remained within an acceptable range to ensure minimum disruption to the environment.

PROJECT

LOCATION

CLIENT

COMMENCEMENT

DISCHARGE POINT

HIGHLIGHTS

Sediment Removal Frac Tank

Greater Vancouver Regional District, BC

Undisclosed


2019

City Storm System


• Sediment Control
• Frac Tank
• Floucculants

SUMMARY

Sediment control for a commercial development. System uses flocculant and a frac tank to remove sediment before discharge into the storm system.

PROJECT

LOCATION

CLIENT

COMMENCEMENT

DISCHARGE POINT

HIGHLIGHTS

Wheel Washes

Surrey, BC

Undisclosed

2019

N/A


• 2 Tire Revolutions
• 120 GPM
• 45 Tonne Max Load
• Model – TW24

SUMMARY

Installation of a MODEL-TW24 automatic tire washer for a commercial development in Surrey. This Wheel wash boasts 2 tire revolutions, 120 gpm, & a max load of 45 tonne.

PROJECT

LOCATION

CLIENT

COMMENCEMENT

DISCHARGE POINT

HIGHLIGHTS

Metrocan

Burnaby, BC

Undisclosed


2019

Burnaby City Storm System


• Flocculant Injections
• pH Control
• 3 Setting Tanks
• Sand Filter

SUMMARY

Sediment control for a commercial development in Burnaby. System utilizes flocculant injection, pH control, 3 settling tanks and sand filter before discharge into the storm system.

PROJECT

LOCATION

CLIENT

COMMENCEMENT

DISCHARGE POINT


HIGHLIGHTS

YRV Remediation

YVR – Richmond, BC

Jacob Brothers


2018

Environment, CSR Standards DW & AW


• Iron Contamination
• Sediment Removal
• pH Control
• Sand Filter
• Bag Filtration

SUMMARY

Remediation for iron contamination using oxidizer injection system, sand and bag filtration for YVR. The system utilized flocculant injection, pH control, 4 frac settling tanks, sand and bag filtration before discharge into the environment meeting CSR standards DW & AW.